- All
- Commercial/Public
- Industrial
- Power
- Transportation
- Water/Wastewater

Entergy Transmission Towers

Grout Replacement Reduces Vibration on Turbine Generator

Silos Strengthened at Power Plant

The Passages of Jupiter Island

New Construction with P-T: The Surf Club

New Structural Liner and Cast-in-Place Roof for Sulfur Pit

Phased Rehabilitation Returns Sulfur Pit to New Condition

Galvanic Cathodic Protection of Power Plant Dock

Nuclear Power Plant Roofing Repairs

Fallingwater Strengthening

Corrosion Control at Dockside Condominiums

Post-Tension Parking Garage Repair

Delayed Coking Unit Chute Plate System

New Light Rail Station Waterproofing

Strengthening and Restoration of Casino

Construction of Clinker Silos

Huey P. Long Bridge Widening Phase 1

Structural Defects in Courthouse Square

Innovative Parking Garage P-T Repair

Cathodic Protection of Historic Terra Cotta Cornice

Celanese Rainwater Treatment Tanks

Miami-Dade Implements StrongPIPE® System for Pipeline Upgrades

Pipeline Repair at Nuclear Generating Station

Kearns 5 MG Water Storage Tank

Investigate Design-Build Approach is Successful for Grouting Repair

CFRP System Repairs Riveted Steel Penstock

Polyshield® System for Vacuum Pumps

Post-Tensioned Slab Opening for New Staircase

North Arm Fraser River Crossing

Medical Research Building IV

Design-Build Grouting Solution Stops Leakage

Bayonne Bridge Abutment Rehabilitation

Owings Mills Town Center Garage

Compressor Foundation Analysis & Repair Reduces Vibration

Indian Creek Village Bridge Restoration

City of Provo West Side Tanks #1 & #2

ICCP System Replacement at Nuclear Plant

Kennecott Humboldt Mill – Structural Strengthening

Vacuum Tower LifeJacket® Installation

Sabah Al-Salem University Fire Damage Repairs

Coke Pit Wall System Improves Long-Term Durability

Interconnected Silos Built with Post-Tensioning

Leon County Courthouse Parking Garage Strengthening

BWI Airport Central Parking Structure

Solution Stops Water Infiltration

Parkland Hospital Expansion

Nappanee Long Term Control Improvements Project

Strengthening & Reinforcement of a New Chimney

Eisenhower Barracks Repair & Strengthening

Strengthening of Arena’s Beams

Providence Pipe Rehabilitation

Two-Phased Repair of a Cooling Tower Basin

Post-Tensioning on Texas Skyscraper

Power Plant Storm Water Pipe Strengthening

Punching Shear Repaired with V-Wrap™ CFRP System