- All
- Commercial/Public
- Industrial
- Power
- Transportation
- Water/Wastewater

Design-Build Grouting Solution Stops Leakage

Innovative Parking Garage P-T Repair

Silos Strengthened at Power Plant

Galvanic Cathodic Protection of Power Plant Dock

Strengthening of Arena’s Beams

Medical Research Building IV

Kearns 5 MG Water Storage Tank

Delayed Coking Unit Chute Plate System

Strengthening and Restoration of Casino

Strengthening & Reinforcement of a New Chimney

Leon County Courthouse Parking Garage Strengthening

Post-Tension Parking Garage Repair

New Light Rail Station Waterproofing

Power Plant Storm Water Pipe Strengthening

Bayonne Bridge Abutment Rehabilitation

Woodrow Wilson Bridge Heavy Lifting

Emergency Pre-Stressed Concrete Cylinder Pipe Upgrade

The Passages of Jupiter Island

Sabah Al-Salem University Fire Damage Repairs

Solution Stops Water Infiltration

City of Provo West Side Tanks #1 & #2

Phased Rehabilitation Returns Sulfur Pit to New Condition

Owings Mills Town Center Garage

CFRP System Repairs Riveted Steel Penstock

Pipeline Repair at Nuclear Generating Station

Miami-Dade Implements StrongPIPE® System for Pipeline Upgrades

Post-Tensioned Slab Opening for New Staircase

Huey P. Long Bridge Widening Phase 1

Fallingwater Strengthening

Celanese Rainwater Treatment Tanks

North Arm Fraser River Crossing

Construction of Clinker Silos

BWI Airport Central Parking Structure

Post-Tensioning on Texas Skyscraper

San Jose / Santa Clara Digesters Upgrade

Kennecott Humboldt Mill – Structural Strengthening

Providence Pipe Rehabilitation

Structural Defects in Courthouse Square

Nappanee Long Term Control Improvements Project

Nuclear Power Plant Roofing Repairs

Interconnected Silos Built with Post-Tensioning

Indian Creek Village Bridge Restoration

Parkland Hospital Expansion

Two-Phased Repair of a Cooling Tower Basin

Investigate Design-Build Approach is Successful for Grouting Repair

Entergy Transmission Towers

Vacuum Tower LifeJacket® Installation

Punching Shear Repaired with V-Wrap™ CFRP System

Corrosion Control at Dockside Condominiums

New Construction with P-T: The Surf Club

New Structural Liner and Cast-in-Place Roof for Sulfur Pit

Compressor Foundation Analysis & Repair Reduces Vibration

Coke Pit Wall System Improves Long-Term Durability

Post Tensioning Repair Robinson Garage

Grout Replacement Reduces Vibration on Turbine Generator