A chlorinator structure in a Gulf Coast chemical plant was vibrating beyond its existing design perimeters causing structural damage and unexpected downtime.

Supported by four footings, the soil beneath was weak and led to unwanted movement of the structure.

Project Overview

  • Implemented the Investigate, Design, Build approach
  • Repairs successfully reduced the levels of vibration
  • Project was completed on schedule and on budget

A chlorinator structure in a Gulf Coast chemical plant was vibrating beyond its existing design perimeters causing structural damage and unexpected downtime. Supported by four footings, the soil beneath was weak and led to unwanted movement of the structure.

Using an Investigate-Design-Build approach, STRUCTURAL TECHNOLOGIES performed a condition assessment to determine the root cause and level of damage along with a design feasibility study. STRUCTURAL, an exclusive licensee, drilled over 8-feet below the structure through multiple layers of concrete and soil followed by grout injection.

Repairs were completed on budget and on schedule and greatly reduced the levels of vibration.

PROJECT INFO

  • Location: Gulf Coast
  • Design Builder: STRUCTURAL

SOLUTIONS

MARKET

Related Projects

Contact Us

Ready to take the next step? Reach out to our team today and let’s work together on solutions to your infrastructure challenges.

Scroll to top